本文介紹了模具加工合同的基本內容,包括甲方與乙方的權利義務、技術要求、交貨時間、質量標準、價格等方面的規定。此外,文章還提供了一些簽訂模具加工合同需要注意的事項和步驟。

模具加工合同4篇 精準合同,完美成型:模具加工合同的要素解析

第1篇

the sale of the friendly negotiation of both parties, the buyer seller commissioned processing production ________ mould co ______ set. the two sides reached the following processing agreement

product name serial number part name point number (mold type) mold single price (rmb yuan) delivery condition

1. the buyer is responsible for the delivery of the r & d requirements and plans of the seller's project, and provides the sales forecast as far as possible.

2. the buyer is responsible for the delivery of the product design drawings and other related technical information required by the seller to the seller and the technical support.

3., the buyer has the sole right to interpret the product design drawings and related technical data delivered to the seller. when there is ambiguity, the seller shall consult the buyer's opinion and confirm it by the buyer.

4. after the seller completes the design and manufacture of the mould, the buyer will go to the seller's site to verify the mold, or to provide the product sample to the buyer for confirmation and confirmation by the seller. the moulds referred to in this contract include the mould of the product itself and the fixture and mould needed for the subsequent production.

1. the seller is responsible for the design and manufacture of the moulds according to the product design drawings and other related technical information provided by the buyer.

be responsible for completing the mold according to the buyer's design requirements in accordance with the stipulations of the contract.

2. the seller shall be responsible for providing timely certification and sample test, trial production of desired products. at the same time the seller must provide the details of the related products.

the detailed test report is for the buyer's confirmation. in case of repair / modification, the test report is also attached at the same time.

1.5 the seller shall give the buyer the corresponding compensation in the form of the buyer's approval as the seller causes the buyer to spend the labor and cost outside the normal technical support as a result of the seller's cause.

2.1 the seller after the receipt of the buyer after the confirmation of product drawing, which began to enter the mold design and production stage, open cycle for ________ days

2.2 due to buyer's cause the delay of mold making progress is not calculated.

2.3 if the seller's mold making process and other mistakes lead to the failure of the mold to be accepted and the buyer is in urgent need of production.

at the same time, the production should be arranged with the existing mold, and the die should be reopened according to the requirements of the drawings and samples.

3.1 separate settlement: monthly knot, 60 days after the opening of the ticket, open 17% vat invoices.

3.1.1 of the total amount of the contract manufacturing batch mould (including vat) for rmb _________ yuan (rmb ________ yuan), the buyer to pay the total amount of _____% mold, mold ___% residual cost allocation in the first 50k products, if the number of orders less than 50k, the buyer shall supply the seller after the unamortized tooling cost.

3.1.2 from the two sides after the signing of the contract, the seller to provide value-added tax invoices (mold total ____%), the buyer within twenty working days of payment.

4. product order: only after the quality acceptance of the product sample is qualified and the buyer's written confirmation, the seller may accept the order of the third party authorized by the buyer or the buyer. the order contract signed by third parties authorized by the buyer with the buyer's seller is subject to this contract.

after the seller has completed the mold, the seller agrees to guarantee the quality of the product in accordance with the buyer's quality standard (the first confirmation report).

the buyer reserves the right to modify the content of the quality standard in accordance with the actual needs.

1. the ownership of all moulds and clamping fixtures and their assembly drawings and parts drawings (including 2d and 3d) involved in the contract shall be owned by the buyer, and the seller shall not interfere with the buyer's disposition of the molds. if the seller is responsible for the custody of the seller, the seller shall not supply the mould to the third party without the buyer's consent, otherwise the buyer shall have the right to ask the seller to return the mold fee and compensate for the loss.

2. when the buyer pays the mold cost, the seller must cooperate with the buyer or the third party designated by the buyer to transfer the inspection and accept the replacement of the die from the seller's place, and will replace the worn parts at the expense of itself, so as to ensure the restart of production. the seller is obliged to assemble, rust and pack the moulds and send it to the place designated by the buyer. all mold assembly drawings and part drawings (including 2d and 3d) and all clamping devices must be transferred to the buyer at the same time.

3., during the process of mold transfer, such as the improper assembly, rust prevention or packaging of the seller, it will cause damage to the mold, and all direct and indirect losses arising therefrom shall be borne by the seller.

1., the seller guarantees the service life of the mould 500 thousand times, and the seller is responsible for free maintenance during this period. if the mold is not used during the service life, the seller shall be responsible for changing or re opening the mold and taking the corresponding cost.

2. the seller should die changes, maintenance and repairs in a timely manner and register, whether such a modification, maintenance and repair are

the buyer made it. if the buyer is to ask the relevant technical details or evidence, the buyer may register with the time without notice. the seller shall give the buyer a copy of the record once every three months. the seller should take the initiative to complete this task on a regular basis without the buyer's request.

the product and the buyer 1. involved in this contract to provide design drawings and other information in the intellectual property is owned by the buyer, the buyer without permission, the seller shall not disclose to any company or individual, otherwise all the losses resulting from the seller; the buyer only agreed to all data and information provided by the seller by the buyer the purpose of this contract based on the,

2. the seller agrees to the design drawings will not be provided by the buyer and other data or information for the purpose of non contract other than the seller or the buyer has the right to pursue responsibility; without written permission from the buyer, the seller shall not in publications, advertising or other written and oral form to the seller to provide or have provided any data and information.

3., without the buyer's license, it is strictly prohibited for the seller to use this mould to supply other customers other than the buyer or the buyer's designated customer, otherwise all direct and indirect losses arising from it shall be the seller's responsibility.

4. other undisclosed matters of confidentiality are carried out in accordance with the "confidentiality agreement" signed by the buyer and the seller.

1. the seller shall be liable for breach of contract if the seller fails to complete the mold making and sample delivery according to the progress of each stage specified in the 2.1. the seller shall pay the buyer a fine of 2% of the total amount of this contract at a time of one day of delay. the amount of the penalty is not more than the total amount of the contract.

2., if the seller's cause causes the seller's quality to be supplied to the buyer can't meet the buyer's requirements, and the other materials will be lost and scrapped during the assembly process, the seller will fully compensate for the loss and scrap materials and the resulting artificial / stop line costs. the two parties may sign separately the raw material for production.

3. the quality and progress of the product provided to the buyer by the seller for the seller's cause can not reach the buyer.

3. when the mold is certified by the buyer, the seller is responsible for the seal of the mold. if the buyer agrees that the seller is responsible for the subsequent processing and production of the products, the seller shall be responsible for the repair and maintenance of the moulds, and the seller shall make the batch production according to the order of the third party authorized by the buyer or the buyer.

4. for all the molds produced by the buyer, the seller shall provide the buyer with detailed design drawings. all drawings must be made in autocad or pro-eng (pro-el2) and must be transmitted to the buyer in electronic form before the mold opening for approval.

1. repair and maintenance of the mold: the seller is responsible for the repair and maintenance of the mold during the production process.

2., after no dispute between the two sides, the buyer will provide the product design drawings and related technical information to the seller, and send the engineer to the seller's technical exchange or the seller send the engineer to the buyer for technical communication. the product drawings and technical requirements list is attached to annex 1.

3. the seller promised to use the quality requirements of the mold for the system to produce products to the buyer

4. the seller promised to use the mold for the system to produce the product can reach the seller's delivery capacity:

5. the seller promises that all the moulds involved in this contract can be reached to 400 thousand times.

6., without the buyer's permission, it is strictly prohibited for the seller to contract the whole part of the contract involved in the contract to other companies for processing. otherwise, the seller shall be liable for breach of contract in accordance with the breach clause of the contract as a breach of contract.

1.1 after negotiation between the two parties, the seller will provide the final offer of the mould approved by the buyer and sign the price confirmation as an indispensable part of the contract.

the total amount of 1.2 contract (including vat mold ____%) rmb_______.

1.3 the total cost of the price of the mold contains the following expenses, and the seller shall not ask the buyer for the following reasons:

1.3.1 the cost of all the fixtures and tools required by the seller for the molding / two processing / assembly of the product;

1.3.2 the seller, according to the contract, carries out the cost of material, equipment and manpower for mould design, test mould.

1.3.3 the cost of the sample (800 sets) provided by the seller to the buyer for the certification of the mold and product;

1.3.4 the seller is the cost of the die vulnerable spare parts to ensure the normal production of the mold;

1.3.5 the cost of the related tools and tools for other processes that are prepared for the normal production of the product.

1.4 when the written request of the buyer the seller according to the change of the product design for the mould modification, if the mould modification is relatively simple, including less mold material changes and other simple changes from the mold, the seller to the buyer without charges; if the modification is complex, great influence on the whole structure of the mold, then the seller according to the modified working hours for mold to the buyer by the buyer offer, the corresponding mold modification cost. the buyer shall not bear any responsibility for the repair or modification of the mold due to the seller's reason, due to the failure of the mold to meet the buyer's requirements.

1.5 by the seller to the buyer's manual and cost technical support from the normal cost, the seller shall give the buyer recognized the way the corresponding compensation.

2.1 after the seller has received the product drawing file after the buyer's confirmation, that is,

the cost of artificial / stop line formation. the two parties may sign separately the raw material for production.

3. if the seller has caused the seller to the buyer of the product quality and schedule is not up to the requirements of the buyer, the buyer and customer missed the best time to market, or the buyer was forced to cancel the project, so that the buyer and its customers suffer serious losses and loss of material research, in addition to the seller to refund all previous the buyer to pay the purchase price, depending on the actual situation of the seller also bear the buyer direct and indirect economic losses.

4., if the seller is unable to resist force, including the war, fire, strike, and other force majeure caused by chinese law, the buyer will allow the buyer to dismiss it. the seller shall notify the buyer in written form within 24 hours after the occurrence of the force majeure, and the seller is obliged to take all necessary measures to deliver the goods as soon as possible. if the force majeure continues for more than 2 weeks, the buyer has the right to cancel this contract.

5. other unfinished matters: implemented in accordance with the economic contract law.

any dispute arising from the execution of this contract shall be settled through friendly negotiation first. if no negotiation can be reached within 30 days, either party can submit the dispute to the municipal court.

the parties to this contract shall be strictly enforced. if one party fails to perform the contract in the cause of the contract, the party must ask for the consent of the other party two weeks in advance, and the contract shall be terminated.

模具加工合同4篇 精準合同,完美成型:模具加工合同的要素解析 第2張

第2篇

台州時達水暖製造有限公司(簡稱甲方)因生產發展需要,委託 (簡稱乙方)製造塑料模具 副,經雙方友好協商達成如下協議:

4、 按國家相關的模具技術要求設計加工模具,注塑件無飛邊、毛刺。收縮等缺陷;

7、 其它要求按照甲方圖紙所列的技術要求達到標準。

1、 模具質保期內,乙方負責模具的修理,原則上修模地點在甲方,如遇甲方加工設備等原因無法在甲方

完成修理的,可以送回到乙方修理,相關費用由乙方負責;

2、 由於甲方使用不當或甲方需要改動引旨起的模具修改,乙方酌情收取成本費,不計勞務費。

1、合同正式簽訂之後首付定金(預付款)為總額的 %,即 元整; 2、模具交貨驗收合格後再付總額的 %,即 元整; 3、餘款在模具交貨驗收合格後 天內付清。

1、 如乙方準時按質量完成模具加工,甲方應按時支付給乙方相應的模具款,如未按時支付(非人為因素

除外)模具款,甲方應支付遲納金或延期模具總價的 %。

2、 乙方應按時按質地完成模具的加工及相關的修理,如乙方不能按時交模,則每延遲交模時間(含試模

合格的時間)一天甲方將從應付予乙方的模具款中扣除1000元以示懲罰,如果延遲交模時間超過1個月,甲方就不再接收此模具,並有權收回此模具之全部已付款,乙方同時須向甲方繳納相當於此模具製造價格1倍的違約金,並承擔甲方由此造成的一切損失,其它事項雙方協商解決或按?合同法?相關條款處理。

八:本協議一式兩份,甲、乙雙方各執一份,甲、乙雙方代表簽字、蓋章生效。

1、 模具的表面不允許有影響模具使用及維修的劃傷或碰凹處;凡質量超過25kg的 板必須做吊裝孔;模具要求結構合理,產品脱模順利;

2、 對於新委託加工模具的分供方,本公司規定第一次只能付預付款為模具總價的40%,後期付款方式待乙方第一批(副)模具加工出來之後視其模具加工的質量而定。對定向委託加工方按本協議第六條之規定付款;

3、 乙方必須按照嚴格甲方要求選用正確的模具材料,如果甲方發現乙方未經甲方同意擅自改動模具用料或者在模具材料選用方面以假亂真,甲方有權向乙方索取相應賠償為該模具總價的1倍。乙方加工的模具的型芯及型腔、滑塊等重要構件在試樣合格以後均需氮化處理,同時乙方有必要在交付模具的時候附上重要構件的材料牌號證明及相關熱處理説明;,

4、 甲方有權定期或不定期核實乙方的模具加工進度,當甲方在核實到實際情況認為乙方沒有能力或未能按時按質完成本合同時甲方有權單方面終止合同,同時收回已付款項,並擁有向乙方索取相應賠償的權利;乙方在正式加工模具前必須向甲方開列模具結構圖,並做必要的説明,以便甲方進行可行性分析。

5、 乙方加工模具需嚴格按照gb4170—84?注塑模零件技術條件及附錄?內容加工,模具驗收時甲方要求

乙方提供加工該模具所用的電極(易損處日後維修用); 乙方在正式交付模具之前須由甲方派工程師到乙方工廠現場試模(每模試樣20模次以上),待試模件正式驗證合格並經本公司相應工程技術人員簽字確認後方可拉回本公司試模,經本公司(產品設計工程師、模具設計工程師、質量檢測部)相關人員簽字確認並經入庫之後方可再付相應的二期模具款;

6、 在加工過程中,如乙方為達到甲方的要求需要改動產品結構時,必須提交相關的書面説明報知甲方,待甲方相關人員審核通過之後才能着手加工;

7、 一般情況下模具要求採用標準模架製作,模具加工完工後乙方須在模具的側面(非工作表面或模腳)刻上該模具名稱,文字線寬為3mm,深度為0。5mm左右;

8、 對於複雜模具的安裝,乙方為甲方指導安裝或提供相關説明;一般情況下模具的簡單維修可由本公司模具車間員工進行,如遇不能解決或無法解決之維修情況,乙方有義務在接到甲方的維修要求電話或其他信息24小時以內到位着手維修,否則甲方將拒付相應模具款,同時乙方不能享受本公司定向委託方的相關條例所定之優惠條件。

9、 乙方必須對甲方提供的產品結構圖及其它有關圖紙保密,如發現因乙方泄露而導致甲方損失的,甲方有權照實際損失對乙方進行索賠;

10、本附件由雙方代表簽字、蓋章後隨合同一起生效。

注:以上價格含國家規定增值税,模具協作方在本公司按合同支付出相應款項後應開列相應的正式發票。

第3篇

經買賣雙方友好協商,買方委託賣方加工生產____模具共______套。雙方達成如下加工協議

產品名稱序號零件名稱穴數(模具類型)模具單價(rmb元)交貨條件

1.買方負責交付給賣方本項目的研發進度要求及計劃,並儘可能地提供項目的銷售預測。

2.買方負責交付給賣方執行本合同所需的產品設計圖紙和其他相關技術資料,並且負責技術方面的支持工作。

3.對交付給賣方的產品設計圖紙和相關技術資料,買方具有唯一的解釋權,當發生歧義時,賣方應徵詢買方意見,由買方確認。

4.賣方完成模具的設計和製造後,由買方去賣方現場對模具進行驗證確認或由賣方提供產品樣品到買方進行驗證確認。本合同中所指模具包含產品本身的模具及後續生產所需的夾治具和模具。

1.賣方負責根據買方提供的產品設計圖紙和其他相關技術資料進行模具的設計和製造,賣方

負責按照合同規定按時完成符合買方設計要求的模具。

2.賣方負責按時按量提供認證及樣板測試、試產所需的產品。同時賣方必須提供相關產品的詳

細的檢驗測試報告供買方確認。如需修/改模,送板時同時也要附檢驗測試報告(註明修改的

3.模具由買方認證合格後,由賣方負責模具的封存。如買方同意賣方進行產品的後續加工生產,則由賣方負責模具的修理和維護,賣方必須根據買方或買方授權的第三方的訂單進行批量生產。

4.對給買方生產的所有模具,賣方應提供的詳細的設計圖紙給買方。所有的圖紙必須以autocad或pro-eng(pro-el2)製作,並且必須在開模之前以電子檔形式傳給買方以供批准。

1.模具的修理和維護:在生產過程中模具的修理和維護由賣方負責;

2.在雙方協商無異議之後,買方提供產品設計圖紙及相關技術資料給賣方,並派工程人員同賣方進行技術交流或賣方派工程人員到買方進行技術交流,產品圖紙及技術要求列表見附件1;

3.賣方承諾使用所承製的模具生產出的產品能夠達到買方的品質要求

4.賣方承諾使用所承製的模具生產出的產品的產能能夠達到賣方的交貨要求:

5.賣方承諾本合同中所涉及的所有模具均能達到40萬次。

6.未經買方允許,嚴禁賣方將本合同中所涉及的任何一付模具整體或部分外包給其它公司進行加工,否則視為違約,由賣方依本合同的違約條款承擔違約責任。

1.1經雙方協商後,由賣方提供買方認可的模具最終報價,並簽訂價格確認書,作為本合同不可缺少的一部分。

1.3模具價格總金額已包含如下費用,賣方不得以以下原因向買方要求費用:

1.3.1賣方對產品進行成型/二次加工/組裝所需的所有夾具和治具的模具的費用;

1.3.2賣方按合同規定進行模具設計、試模所需的材料和設備及人工等費用;

1.3.3賣方提供給買方進行模具和產品認證的試模樣品(800套)的費用;

1.3.4賣方為保證模具正常生產製作的模具易損備件的費用;

1.3.5賣方為保證產品正常生產所準備的其他工序的相關工具和治具的費用。

1.4當買方書面要求賣方根據產品設計的變更對模具進行修改時,如果模具修改較簡單,包括從模具上減除模具材料的修改和其他簡單修改,則賣方不需向買方收費;如果模具修改較複雜,對整個模具的結構影響很大,則由賣方根據修改模具所需工時向買方報價,由買方承擔相應的模具修改費用。如果因為賣方的原因,因模具不能滿足買方的要求而進行的修模或改模,買方不承擔任何責任.

1.5由於賣方原因導致買方需要花費正常技術支持外的人工及費用,賣方應根據買方認可的方式給予相應的補償。

2.1賣方在收到買方確認後的產品圖檔之後,即開始進入模具設計和製作階段,開模週期為__25__天

2.3如果賣方模具製作出現工藝和其它的錯誤,導致模具無法驗收合格而買方又急需生產,賣方應先用現有的模具安排生產,同時再根據圖紙和樣板要求免費重新開模。

3.1單獨結算的方式:月結,開票後60天,開17%增值税發票.

3.1.1本合同製造整批模具的總金額(含增值税)為人民幣_________元整(人民幣________元整),買方支付模具總金額的_____%,剩餘___%模具費分

攤在首50k產品內,如果訂單數量不足50k,買方需補給賣方未攤完的模具費。

3.1.2自雙方合同簽訂後,賣方提供增值税發票(模具總額的___0%),買方在二十個工作日內支付。

4.產品定單:唯有產品樣品品質驗收合格且經買方書面確認後,賣方方可接受買方或買方授權的第三方的訂單。買方授權的第三方同買方賣方簽定的訂購合同服從於本合同。

賣方在完成模具後,賣方同意按照買方品質標準以保證產品品質(首件確認報告).

買方對品質標準的內容根據實際需要保留修改的權利。

1.本合同所涉及的全部模具和夾治具及其組裝圖和零件圖(包括2d和3d)的所有權,均歸買方所有,賣方不得干涉買方對模具的處置權。如在賣方生產,由賣方負責保管,未經買方同意,賣方不得將此模具提供給第三者生產,否則買方有權要求賣方退還模具費並賠償造成的損失.

2.買方付清模具款後,要求將模具從賣方處轉出時,賣方必須配合買方或買方指定的第三方進行轉移驗收,並自行承擔費用將磨損部件更換以保證重新開始生產。賣方有義務對模具進行組裝、防鏽和包裝處理,併發運至買方指定的地點。所有模具的組裝圖和零件圖(包括2d和3d)和所有夾治具必須同時轉移給買方。

3.模具轉移過程中,如因賣方不當組裝、防鏽或包裝的原因,造成模具損壞,由此產生的所有直接損失和間接損失一律由賣方承擔。

1.賣方保證模具使用壽命50萬次,並在此期間內由賣方負責免費保養維修,如模具在使用壽命內不能使用,賣方應負責更換或重新開模,並承擔相應的費用.

2.賣方應對模具的修改、維護和修理等情況及時登記造冊,無論此種修改、維護和修理是否由

買方提出。如買方要詢問有關的技術細節或證據,買方可以隨時間登記,無需通知。賣方每三

個月應將登記記錄複印一次給買方。賣方應主動定期完成此項任務,無需買方另行提出要求。

1.本合同所涉及的產品造型及買方提供的設計圖紙和其他資料中所包含的知識產權為買方所擁有,未經買方許可,賣方不得向任何公司和個人泄漏,否則由此產生的一切損失由賣方負責;買方僅同意賣方基於本合同項下的目的使用買方所提供的一切資料和信息,

2.賣方同意其不會將買方所提供的設計圖紙和其他資料或信息用於非本合同以外的其他目的,否則買方有權追究賣方相應的責任;未經買方書面許可,賣方不得在出版物,廣告中或以其它書面、口頭形式涉及賣方提供或已提供之任何資料和信息。

3.未經買方許可,嚴禁賣方使用本模具向除買方或買方指定的客户以外的其他客户供貨,否則由此產生的一切直接損失和間接損失一律由賣方負責;

4.其它未盡保密事項,依買方與賣方簽訂的“保密協議”執行。

1.如果賣方方未能按2.1中規定的各階段的進度完成模具製作及送樣,由賣方承擔違約責任。每延誤一天,賣方須付給買方本合同總金額的2%作為罰金,罰金累計額最多不超過本合同模具總金額。

2.如果因為賣方的原因造成賣方提供給買方的產品的品質達不到買方的要求並且在組裝過程中導致其他物料的損失和報廢,賣方全額賠償損失和報廢的物料及因此形成的人工/停線費用。雙方可另行簽署生產用原材料/零部件採購合同進行約定。

3.如果因為賣方的原因造成賣方提供給買方的產品的品質和進度達不到買方的要求,使買方及其客户錯過了產品上市的最佳時機,或者買方被迫因此取消此項目,從而使買方及其客户遭受嚴重的研發損失和備料損失,則賣方除退還所有前期買方所支付的貨款外,視實際情況賣方另外承擔買方直接及間接的經濟損失。

4.如賣方因為不可抗拒力(包括戰爭、火災、罷工和中國法律規定的其他不可抗拒力造成的供貨延遲,買方允許買方免責。賣方應在不可抗拒力發生後24小時內以)書面形式通知買方,並且賣方仍有義務採取一切必要措施儘快交貨。若不可抗拒力持續2周以上,買方有權取消本合同。

對於實施本合同而發生的任何爭議,雙方首先通過友好協商解決,如在30天內協商不成,任何一方均可將爭議提交xx市法院處理.

本合同雙方須嚴格執行,如一方因故不能履行合同,必須提前兩週徵得對方同意,方可終止本合同。

第4篇

為了增強甲乙雙方的責任感,加強經濟核算,提高經濟效益,確保雙方實現各自的經濟目的,經甲乙雙方充分協商,特訂立本合同,以便共同遵守。

1、模具的名稱:按照每次《模具外協加工單》標註的名稱;

3、模具的技術標準(包括質量要求),按下列第( )項執行:

(2)無國家標準而有部頒標準的,按部頒標準執行;

(4)沒有上述標準的,或雖有上述標準,但需方有特殊要求的,按甲乙雙方在合同中商定的技術條件、樣品或補充的技術要求(如>)執行。  第二條 模具的包裝標準:

1、交貨方法:乙方按照雙方約定的日期送貨到甲方工廠,費用由乙方自行負責。

3、到貨地點和接貨單位(或接貨人)________________。

2、模具貨款的結算:模具交付甲方,待驗收合格後,甲方在本月月底支付已方模具費。

第五條 甲方向乙方提供模具圖紙及該圖紙的電子文檔(如附件)。

第六條 模具的工藝要求:模具圖紙、模具外協加工單如附件。

1、乙方到期不能交貨,應向甲方償付總貨款的30%的違約金。

2、乙方所交模具品種、型號、規格、花色、質量不符合合同規定的,如果甲方同意利用,應當按質論價;如果甲方不能利用的,應根據模具的具體情況,由乙方負責包換或包修,並承擔修理、調換或退貨而支付的實際費用。乙方不能修理或者不能調換的,按不能交貨處理。

3、乙方因模具包裝不符合合同規定,必須返修或重新包裝的,乙方應負責返修或重新包裝,並承擔支付的費用。甲方不要求返修或重新包裝而要求賠償損失的,乙方應當償付甲方該不合格包裝物低於合格包裝物的價值部分。因包裝不符合規定造成貨物損壞或滅失的,乙方應當負責賠償。

4、乙方逾期交貨的,向甲方償付逾期交貨的違約金,並承擔甲方因此所受的損失費用。

1、甲方中途退貨,應向乙方償付退貨部分貨款30%的違約金。

2、甲方逾期付款的,應按照中國人民銀行有關延期付款的規定向乙方償付逾期付款的違約金。

3、甲方違反合同規定拒絕接貨的,應當承擔由此造成的損失。

4、甲方如錯填到貨地點或接貨人,或對乙方提出錯誤異議,應承擔乙方因此所受的損失。

甲乙雙方的任何一方由於不可抗力的原因不能履行合同時,應及時向對方通報不能履行或不能完全履行的理由,在取得有關主管機關證明以後,雙方另行協商履行期限,並根據情況可部分或全部免予承擔違約責任。

第十一條 如甲方因生產需要,要求增加該模具數量,其價格另議。

第十二條 解決合同糾紛的方式:甲乙雙方如果發生爭議,應當友好協商解決。如協商不成,任何一方均有權將爭議提交北京仲裁委員會。按照提交仲裁時該會現行有效的仲裁規則進行仲裁,仲裁裁決是終局的,對甲乙雙方均有約束力。

第十三條 雙方本着誠原則簽定本合同,若有未盡事宜,須雙方另行協商解決,作出補充規定,補充規定與本合同具有同等效力。